Posted: Mon Jul 11, 2005 6:59 am
Hi all, I have an A16 Ultra and it´s connected to my 15 DSP board trought Zlink, but in this mode the A 16 don´t be as a master clock, don´t transmit anything for Zlink connections, only ADAT is available.
What do you think is the best way to connect:
1. ZLink cables and Scope as master clock.
2. A16 as master clock, Scope slave trought wordclock and signal go to ADAT.
What do you think about this?
Thank you in advance
Roberto
What do you think is the best way to connect:
1. ZLink cables and Scope as master clock.
2. A16 as master clock, Scope slave trought wordclock and signal go to ADAT.
What do you think about this?
Thank you in advance
Roberto